CONSTRUCTION

  • Design conceived to reduce construction costs and deadlines.

  • Drillable tunnels with tunnel-boring machines (TBM) in, at least, a 50% of the length.

  • Central section in the double tube to allow the compositions crossings.

  • Transversal galleries that allow:

    • Up to 12 simultaneous drilling fronts.
    • To adapt construction systems to land types.
    • To access and evacuation in operation.
    • An extension of the second tube without interfering with the service.
    • Risks, costs, and deadlines control.
  • Ease of access to construction areas.

  • Use of materials: concretes manufacturing, esplanades creation for the stations, etc. Minimum waste disposal in dumps.

  • Suitable cross section for single road and designed for legal gauges in Colombia.

  • Space for other service networks: communications, electricity, gas, etc.

Geological profile

seccion